home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 930310.DFC < prev    next >
Text File  |  1993-03-12  |  5KB  |  130 lines

  1. "930310.DFC" (4346 bytes) was created on 03-10-93
  2.  
  3. 10-Mar-93 Daily File Collection
  4.    These files were added or updated between 09-Mar-93 at 21:00:00 {Central}
  5.                                          and 10-Mar-93 at 21:00:23.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:930310.REL
  8.  
  9. 3/10/93:  SPACE STATION REDESIGN SUBJECT OF GOLDIN SPEECH
  10.  
  11. Mark Hess
  12. Headquarters, Washington, D.C.                                             
  13. March 10, 1993
  14.  
  15.  
  16. NOTE TO EDITORS: N93-10
  17.  
  18.         NASA formally kicks off the presidentially-mandated redesign of the
  19. space station this week.  NASA Administrator Daniel S. Goldin will broadly
  20. outline some of the basic elements of the redesign process in a speech to be
  21. given Wednesday, March 10, at the American Astronautical Society-Goddard
  22. Memorial Symposium being held at the Hyatt Regency Hotel, Crystal City,
  23. Arlington, Va.
  24.  
  25.         Goldin is the featured luncheon speaker at the AAS conference and will
  26. make his address at noon EST. The event will be recorded for video tape-delay
  27. broadcast on NASA Select television at approximately 3 p.m.  EST.
  28.  
  29.         The first formal meeting of the Space Station Redesign Team will be
  30. held today when NASA will kick off the redesign effort with meetings of top
  31. agency managers and center directors, congressional leaders and international
  32. partners.
  33.  
  34.         On Thursday, March 11, Goldin will lead a press briefing at 1 p.m.  EST
  35. to discuss the details of the redesign process.  He will be joined by senior
  36. NASA officials involved in the space station redesign.
  37.  
  38.         The press briefing will be carried live on NASA Select television from
  39. the auditorium located on the lobby level of the new NASA Headquarters
  40. building, 300 E Street, S.W., Washington, D.C.
  41.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  42. =--=--=-END-=--=--=
  43.  
  44. =--=--=START=--=--= NASA Spacelink File Name:930310.SHU
  45.  
  46. KSC SHUTTLE STATUS 3/10/93
  47.  
  48.  
  49.               SPACE SHUTTLE DAILY STATUS-STS 55
  50.                   Wednesday, March 10, 1993
  51.  
  52.  
  53. George H. Diller
  54. Kennedy Space Center
  55.  
  56.  
  57. Vehicle: OV-102/Orbiter Columbia    Mission: STS-55
  58. Current location: Pad 39-A          Orbital altitude: 184 sm
  59. Payload: Spacelab D-2               Inclination: 28.45 degrees
  60. Launch date: TBD                    Landing: KSC
  61. Mission duration: 8 days 22 hours   Crew size: 7
  62.  
  63.  
  64. STS-55 IN WORK:
  65.  
  66. -  Flight Readiness Test (FRT) of main engines/flight controls
  67.  
  68.  
  69. STS-55 WORK SCHEDULED:
  70.  
  71. - conclusion of Flight Readiness Test (FRT) on Thursday
  72. - enhanced orbiter refrigerator/freezer (EORF)
  73.   interface verification test (IVT) Thursday night
  74. - orbiter aft confidence test Thursday night
  75. - begin aft compartment closeouts Friday
  76. - begin avionics bay closeouts Friday
  77. - external tank purges Friday
  78.  
  79.  
  80.  
  81. STS-55 WORK COMPLETED:
  82.  
  83. - reinstalled hydraulic hoses
  84.  
  85.  
  86.  
  87. SPECIAL TOPICS: (STS-56)
  88.  
  89.      Discovery's rollout from the Vehicle Assembly Building to Launch Pad 39-B
  90. is scheduled for 8 a.m. on Saturday, March 13.
  91.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  92. =--=--=-END-=--=--=
  93.  
  94. =--=--=START=--=--= NASA Spacelink File Name:6_12_7.TXT
  95.  
  96. Mir element set 928 (10-Mar-93)
  97.  
  98. Mir
  99. 1 16609U 86 17  A 93 69.44198879  .00029536  00000-0  36741-3 0  9282
  100. 2 16609  51.6220 355.2378 0002332 106.3933 253.7596 15.59699152403734
  101.  
  102. Satellite: Mir
  103. Catalog number: 16609
  104. Epoch time:      93069.44198879
  105. Element set:     928
  106. Inclination:       51.6220 deg
  107. RA of node:       355.2378 deg          Semi-major axis:  3653.6833 n.mi.
  108. Eccentricity:    0.0002332              Apogee altitude:   210.6012 n.mi.
  109. Arg of perigee:   106.3933 deg          Perigee altitude:  208.8971 n.mi.
  110. Mean anomaly:     253.7596 deg          Altitude decay:      0.0461 n.mi./day
  111. Mean motion:   15.59699152 rev/day      Apsidal rotation:    3.7508 deg/day
  112. Decay rate:     2.9536E-04 rev/day~2    Nodal regression:   -5.0227 deg/day
  113. Epoch rev:           40373              Nodal period:       92.2639 min
  114.  
  115. G.L.CARMAN
  116.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  117. =--=--=-END-=--=--=
  118.  
  119. =--=--=START=--=--= NASA Spacelink File Name:6_2_18_5.TXT
  120.  
  121.  NOTE: This file is too large {26031 bytes} for inclusion in this collection.
  122.     The first line of the file:
  123.  
  124. - Current Two-Line Element Sets #155 -
  125.  
  126.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  127. =--=--=-END-=--=--=